A roofing job runs on a schedule: the tear-off is booked, the crew is booked, and the weather window is short. If the material is late, wet, or leaning on its pallets, the whole job stops. Roofing freight is not hard to ship, but it has a few rules of its own.
Shingles weigh out before the truck is full
Asphalt shingles are dense. Most architectural shingles run three bundles to the square (a square covers 100 square feet of roof) and 36 to 42 bundles to the pallet, so a pallet typically weighs 2,500 to 3,500 pounds, depending on the product.
The legal limit is 80,000 pounds for the truck, trailer, and freight together. That leaves a standard flatbed about 45,000 to 48,000 pounds of freight, and a Conestoga or dry van a few thousand pounds less. So a full truckload of shingles on a flatbed is often 13 to 18 pallets, spread along the deck to keep the axle weights legal, with deck space left over. In freight terms, shingles weigh out before they cube out: the truck hits its weight limit before it runs out of room.
Two things follow from that. Get the real pallet weight from the supplier, because a guess that is a few hundred pounds light per pallet puts the truck overweight. And do not plan on filling the empty deck space with more shingles.
A roofing load is rarely just shingles
Shingles, starter, and hip and ridge
Heavy, palletized, and wrapped. Do not double-stack the pallets unless the supplier says the product allows it.
Underlayment and boxed accessories
Felt, synthetic underlayment, ice and water shield, and cartons. Lighter freight, but the cartons and felt rolls have to stay dry.
Metal panels and trim
Long, and easy to scratch or bend. Panels ship bundled or crated and need a flat deck, dunnage (wood blocking) spaced to support the full length, and edge protectors under the straps.
Single-ply membrane
Rolls of TPO, EPDM, or PVC that run 300 pounds and up apiece and puncture if anything sharp rides against them.
Insulation board (polyiso)
The opposite of shingles: light and bulky, so it cubes out long before it weighs out, and it has to stay dry. The factory wrap is not weather protection.
Tile and slate
Heavy and breakable, crated or palletized. Like shingles, it weighs out before the truck is full.
Which truck fits
Flatbed
The everyday truck for roofing. Plants and supply yards load from the side with a forklift, and a flatbed is built for that. Material that cannot get wet is tarped.
Conestoga
A flatbed with a rolling tarp system that slides open for side loading and closes over the freight. It suits insulation, cartons, and finished metal. It carries a few thousand pounds less than a plain flatbed, and there are fewer of them, so book early.
Flatbed with a truck-mounted forklift
For a jobsite with no dock and no forklift. The driver unloads the pallets to the ground. Contractors often call it a Moffett or a piggyback. The forklift’s weight comes out of what the truck can carry, so the load is a little lighter.
LTL
For a few pallets when the date has room in it. It costs less, but a full shingle pallet is often too heavy for a liftgate, so it fits best when the delivery end has a forklift.
Dry van
For palletized product when both ends have a dock.
Hotshot
For a few pallets that have to be there now. It runs straight to the site when a crew is short on material.
Where it is going changes the plan
A distributor’s yard has a forklift and people who unload trucks all day. Confirm the receiving hours and whether they receive by appointment or first come, first served (FCFS).
A jobsite is different. Ask who unloads, with what, and whether a tractor-trailer can get in, park, and get back out. A freight truck brings the load to the site on the trailer. Someone there has to take it off with a forklift, unless the truck is booked with its own. Either way it is a ground drop: the pallets end up on the ground, not on the roof. Rooftop delivery, where the bundles are set on the roof, is usually done by the roofing supplier’s own boom truck or conveyor truck. If the job needs a roof load, plan that with the supplier.
Keep it dry and keep it square
Shingle pallets in the factory wrap often ship on an open flatbed without a tarp, but that is the supplier’s call, so ask. Cartons, felt, and insulation always have to stay dry, so say what has to be tarped when you ask for the quote. A tarped load costs more than a no-tarp load, because tarping is extra work for the driver, and the truck has to show up with the right tarps. Give the load height so the driver brings tarps that cover it.
How the load is strapped matters as much. Straps cranked down too hard over the bundles crush the edges and can pull a pallet out of square, and a leaning pallet may be refused at delivery. Edge protectors (also called corner protectors) under every strap and even tension go a long way toward preventing it. One of our roofing customers tells that story in his own words.
Book early in storm season
After a big hail storm or a hurricane, roofers across the region order at once. Flatbeds get harder to find, and rates into the area often climb for weeks. If you know the material is coming, book the truck when you place the order, not the day it is ready.
What to send for a quote
- The products, the number of squares or bundles, the pallet count, and the weight per pallet, pallet included.
- The length of anything long, such as metal panels.
- What has to stay dry, the load height, and whether it is a tarp or no-tarp load.
- The pickup location and its shipping hours.
- Whether delivery is to a yard or a jobsite, and who unloads with what.
- The day the crew starts.
Or send it to Fello
We arrange building materials freight to yards, distribution centers, and jobsites in all 48 states and Canada, on flatbeds, Conestogas, dry vans, and more, with one contact start to finish. Crews are scheduled around the material, so if a truck is running late, you hear it from us first, with a plan to fix it. Send over the material, the destination, and the date it has to be there, and we’ll get you pricing and availability quickly.