Flatbed, 48 or 53 ft
The default for building materials. Long, bundled, or top-heavy loads that load from the side.
Learn MoreHave material with a crew and a schedule waiting on the other end?
We source the right trailer for the material and the site, with proactive updates and great communication throughout each move.
We understand the importance of building materials arriving on time, in condition, and where the work is actually happening. Flatbed and building materials freight is what we do every day, to yards, distribution centers, and jobsites in all 48 states and Canada.
Send us the material, the destination, and the date it has to be there. We reach out to our network, negotiate the best possible rate, and get you back a competitive rate quickly.
And more. New material comes in all the time.
Leading distributors count on Fello to keep their freight, and their reputations, moving.
From roofing and lumber to steel and stone, we arrange high-volume deliveries week after week. Proactive communication, vetted carriers, and equipment that is ready for the jobsite are why distributors keep coming back.
The trailer depends on the material and how it comes off at the other end.
The default for building materials. Long, bundled, or top-heavy loads that load from the side.
Learn MoreTaller bundles and machinery, and long structural steel that needs the extra height.
Learn MoreJobsite delivery with no dock. The forklift rides with the load and unloads on arrival.
Learn MoreDeck loading with weather protection for material that cannot get wet.
Learn MorePalletized and moisture-sensitive product that ships enclosed.
Learn MoreOver-dimensional precast, panels, and trusses that will not clear on a flat deck.
Learn MoreFlatbed, step deck, Conestoga, and dry van, one contact start to finish.
The person who quoted your load is the person who works it. They know how your product loads, tarps, and unloads.
Bundled lumber, long structural steel, and drywall that cannot get wet do not belong on the same trailer. We source the one that fits the load and how it will come off at the other end, whether that is a dock, an open jobsite, or a site with no forklift at all.
Crews are scheduled around the material. You hear from us before a delay ever reaches the dock, while there is still time to move the plan.
Every carrier we tender is run through Highway and checked for active operating authority, FMCSA safety record, and insurance in force before your material is on their deck. We also use AI technology to flag at-risk loads and catch bad actors before it is too late.
We move 1,200+ loads a month in all 48 states and Canada. Across all shipments, updated quarterly, 98.3% of pickups and 98.4% of deliveries land on time. Last updated 09/30/2026
A roofing and building materials distributor sells into jobs where the delivery date is not a suggestion. A full truckload was rejected, damaged during loading, with a Fortune 500 customer on the receiving end. Fello sourced warehouse partners to re-palletize the shipment, arranged it at no charge, and the load moved. The Fortune 500 relationship held.
The managing partner called it a "relationship-over-profit mentality."
Send over the shipment details, and we'll get you pricing and availability quickly.