Liebherr
LR 1100, 1200, 1300 SX, 11000
Have a crane to move?
We source heavy haul carriers for crawler, RT, and tower cranes and quote permits, escorts, and linehaul together, with proactive updates and great communication throughout each move.
LR 1100, 1200, 1300 SX, 11000
2250, 4100, 14000, 16000 SIII, 18000 Maxer
300, 650
3800
a whole lot of RTs
RT cranes, crawler cranes, tower cranes, pile drivers, track loaders, pipe layers, material handlers, off-highway trucks, excavators, electric rope shovels, dozers, backhoe loaders, forklifts, ABI excavators, and more.
A crawler crane does not ship as one load. The one below took twenty-six.
A customer imported a crawler crane from overseas into the Port of Galveston. Twenty-six loads in all, a mix of heavy-haul, over-dimensional, and legal freight, in the week after the Fourth of July when open-deck capacity is at its tightest. Every load was out of the port in two days, and the customer avoided another day of crane charges and another round of port storage fees.
An industrial equipment customer needed twenty oversize moves covered inside a 72-hour window. The hard part was never any single load. It was twenty carriers with the right trailers and the right experience, all available in the same three days, staged so no two of them collided. All twenty were covered.
Permits and linehaul are quoted together, along with escorts, tarping, detention, and jobsite delivery. No per-mile rate that grows every time another line item surfaces. What you approve is what you are invoiced.
The number you get is backed by a carrier already identified for your move, not a market estimate. You are not quoted one price and then asked for more when it turns out nobody will run it.
The person who quoted your load is the person who works it, and they know the axle configuration and the permit requirements. Behind them is a team that runs this freight every day.
Updates come to you: when the truck is dispatched, when it loads, where it is on the road, and when it will deliver. You should not have to call to find out whether your equipment moved, and you should never hear about a delay from your own jobsite first.
Loads a month
On-time pickup
On-time delivery
On-time figures across all shipments, updated quarterly. Last updated 09/30/2026.
A team that cares about your freight as much as you do.
Send over the dimensions, weight, origin, and destination, and we’ll get you pricing and availability quickly.